My experience in the Energy and Power Industries, is extensive, and includes all fossil power generation, all power distribution, protection, and control, boilers & HRSG, steam and gas turbine generators, reciprocating engines, compression trains, heat transfer, air pollution control, valves, dampers, actuators, rotating equipment, switchgear, unit substations, Un-Interruptible Power Systems UPS, transformers, motors, mechanical and electromechanical engineering.
Typical Technical Services Projects
PDVSA Services / Bluecrest/ KCT Kumana II/ Turbine Technologies – 1 x W501 D5 Barge Mounted Packaged Power Plant Over-Haul and Re-Commissioning, Willemstad, Curacao, Netherlands Antilles – Owner’s Engineer, Progressive Inspection, Expediting, Authorization of Milestones, Project Management, Commissioning Systems, Witness All Testing, Pre-Shipment Inspection, Total Requirements.
PDVSA/General Electric Aero Energy / Inter Rao/ PRIVOD – Venezuela Power Emergency, Qty 13 GE LM 2500 Gas Turbine Generator Packages – La Porte, TX, Cincinnati, OH, Lysva, Perm, Russia – Owner’s Engineering Representative for Full Requirements, Pre-Order Negotiations, Progressive Inspection, Project Management, Vendor Surveillance, Witness Gas Turbine Factory Acceptance Testing, and Pre-Shipment Inspection.
Abdullah A M Al Khodari Sons, Saudi Consolidated Electric Company East – Qurayyah Power Station, 4 x 1000 MW Gas Fired, Supercritical Steam Generating Units, Mechanical Maintenance, Saudization Qualifications Manual, Technical Writing, Project Engineering, and Maintenance Consulting.
PDVSA Services / Venezuela Power Emergency – Severe Drought resulted in power shortage when Guri Dam Hydro Station was not functional. Venezuela Power Emergency Project incorporated unlimited resources and strategies to install gas fired generation in the shortest amount of time. Assets were acquired from world-wide sources including cancelled generation projects, moth-balled generation installations, stranded generation assets, new gas turbine packages, and gray market generation assets. Performed as Owner’s Engineer for Due Diligence Reviews, Technical Strategies, Vendor Proposal Review, Pre-Order Negotiations, Vendor Surveillance, Project Management, Factory Testing, Commissioning, Vendor and Contractor Liason, Inspection, Expediting, and Full Requirements.
PDVSA/ ProEnergy Services – 2 x GE 7EA Packaged Power Plants – South Haven, MS – Preliminary Technical Diligence Review and Inspection for Mothballed Power Generating Units
Babcock Hitachi Kure – Kure, Hiroshima-Ken, Japan, Ultra-Supercritical Steam Generators, Multi Project Engineering Auxiliary Systems Vendor Competitive Analysis, Procurement, Engineering
PDVSA Services, Inc. B.V./ SvF International, MTU Dieselmotor – Qty 20, 8V200M72 Reciprocating Gas Engines, Hato Willemstad, Curacao, Netherlands Antilles – Owner’s Engineer, Pre-Shipment Inspection.
PDVSA Services, Inc. B.V. / Bluecrest/ KCT Kumana II/ NMT Projects International – 1 x W501 D5 Barge Mounted Packaged Power Plant Over-Haul, Balance of Plant Systems, Deerpark, TX – Final Inspection.
PRADO/ Blencor/ Teal Construction – Refrigerated Warehouse Construction, Sealy, TX – Column/ Structural Alignment, Bolt Torque Verifications.
Optim Energy Altura CoGeneration, LLC/ Quadstar Energy Services – Channelview, TX – Owner’s Engineer, Negotiated Master Purchase Agreement.
Quadstar Energy Services – Houston, TX – Technical Marketing Assistance, Project Development.
Quadstar Energy Services – Houston, TX – Technical Assistance for Qualification for National Board R-Stamp.
AGIP/ B&W Fluid Mechanics – Pipeline Internal Crawler & Endoscope, La Porte, TX – Owner’s Engineer, Determination of Field Pipeline Internal Weld Conditions. Pipe was shipped to La Porte for Legal Witness Evaluation.
PDVSA/Ethos Energy – Solar Turbines Centaur 50 Gas Turbine, Houston, TX – Witness Factory Acceptance Testing, Pre-Shipment Final Inspection, Packaging Inspection, and Documentation Review.
Chicago Bridge & Iron/Mitsubishi Heavy Industries – First Pearland, TX Plant Shop Order, Steam Turbine Driven Compression Package, Ingleside Ethylene Wet Air Oxydation Total Requirements, Progressive Inspection and Expediting, Pre-Shipment Inspection, Documentation Review.
General Electric Aero Energy – La Porte Texas, Mechanical Development Project Engineering, LM 6000 and LM 2500, Modec Project, Air, Gas Fuel, Liquid Fuel, Lube Oil, Water, Mechanical Systems as required. Mechanical Design and P & ID Development.
PES, srl Italy/ Siemens/ Enel – Qty 30 Wind Turbine Generator Blades – Galveston, TX – Final Inspection and Document Review.